Peak demand charges
Power peaks, even if they last minutes, determine the peak demand charge for the entire month. A BESS delivers stored energy during those critical moments, reducing the billed peak demand.
Peak demand charges can represent a significant part of an industrial electricity bill. CESC BESS systems store energy during off-peak hours and release it during peak hours, cutting real cost without changing the production process.
Many industrial and commercial electricity tariffs include a peak demand charge calculated on the maximum demand recorded during the month. A single high-demand event — machinery startup, HVAC systems, full-load production — can raise the entire bill for that period.
High consumption variability or processes that generate significant electricity demand peaks.
Power peaks, even if they last minutes, determine the peak demand charge for the entire month. A BESS delivers stored energy during those critical moments, reducing the billed peak demand.
Energy purchased during peak hours is significantly more expensive. A BESS charges during off-peak hours and discharges during peak hours, reducing the average cost per kWh consumed.
For critical operations, a power outage means lost production, lost product, or risk to people. BESS systems act as instant energy backup with millisecond switching.
With your organization's consumption profile, Cynersis calculates the savings opportunity and projected payback. Free during the assessment stage.
Cynersis implements CESC BESS systems with proprietary EMS software that automatically optimizes operation based on the electricity tariff, consumption history, and each organization's goals.
The BESS system reduces demand peaks (peak shaving) and performs tariff arbitrage: charging when energy is cheap and discharging when it's expensive, optimizing the real energy cost month over month.
The Energy Management System operates at three levels: device, edge station, and cloud. It learns the organization's consumption pattern, anticipates peaks, and optimizes battery charge/discharge to maximize savings.
For critical operations, the BESS system acts as a high-capacity industrial UPS: it detects the power outage and switches over in milliseconds, keeping the operation running without interruption until power is restored.
CESC offers a full line for commerce, industry, and large-scale projects. Cynersis sizes the right system based on each client's consumption profile and goals.
Integrated energy storage system with liquid cooling for commercial and industrial applications. 3-level safety, integrated BMS/EMS, and VPP connectivity for total energy cost optimization.
Solid-state system for operations where continuity is essential. "Triple-Zero" technology: no interruption, no electrolyte leakage, no combustion. Millisecond switching.
Pre-engineered systems for large industries or grid-scale storage projects. Up to 5 MWh per unit, liquid cooling, standard container deployment.
The Cynersis energy process starts by understanding your organization's real consumption before proposing any system.
The energy assessment is carried out by an engineer certified in the ISO 50001 energy management standard. It's not a generic sales assessment — it's engineering based on your operation's real data.
Before proposing a system, Cynersis delivers the project's conceptual engineering: recommended BESS size, estimated monthly savings, total investment, and projected payback. You decide with numbers, not promises.
Cynersis Peru delivers complete energy projects, from assessment through implementation, backed by ISO 50001-certified consulting.
Analysis of real consumption profile: bills, peak demand, operating hours, and current tariff structure. Free at this stage.
BESS system sizing, operating strategy (peak shaving, arbitrage, backup), and projected month-by-month savings calculation.
Implementation proposal with total project cost and detailed payback.
Installation, EMS configuration, and BESS system commissioning with remote monitoring activation and operational testing.
Ongoing performance monitoring, savings reports, EMS updates, and local technical support.
Share your organization's consumption profile and Cynersis determines if there's a real opportunity to reduce your electricity bill with BESS.
With your organization's electricity consumption profile, the Cynersis team performs an energy assessment and delivers conceptual engineering with estimated savings and projected payback. Free during the assessment stage.
The Cynersis team will review the information and coordinate the energy assessment shortly.